If you are executing a stress system or strain shutoff then the answer is always Sure. The pump has no Check out valve and one is required to build stress. If you have a really future over the area then introducing one just over the pump is good. Larger two https://flenzy.store/15kw-20kw-high-efficiency-vertical-wind-turbine-generator/